I S Systems, in partnership with iba-Oceania, delivered a substantial & reliability and productivity to the Reelers on a Bucket Reclaimer in Port Hedland.

The Goal

The Reclaimer Reeler control scheme for a Bucket Reclaimer in Port Hedland needed to be improved. The Reelers on the machine have been historically problematic, resulting in production delays and costly damage to drive system clutches.

I S Systems was required to deliver a new control program that improved on the existing scheme, with a major goal of improving machine reliability & productivity.

The Solution

A specialised data logging and analysis package was implemented to assist in fault finding and fine-tuning the Reclaimer Reeler control scheme. The data analysis allowed the engineering team to clearly identify where the flaws in the existing control scheme were, allowing control improvements to be developed offline, and designed to specifically target the issues flagged in the data analysis.

This has resulted in significant improvements in machine reliability and productivity, and the data logging system has proven invaluable to both machine engineers and operators in the ongoing monitoring & maintenance of the machine.

Image displaying logging network of Bucket Wheel Reclaimer, connected from logging equipment via TCP/IP to a DP Master, connected via DeviceNET to VVVF Drives
Configuration for data logging network

Thanks for all the work you have done for us. The report is great and there is comprehensive coverage showing what we need to know.

I have remarked on your meticulous approach to every job. We look forward to working with you from now on.

Francisc Majdik
Analysis & Improvement Electrical Engineer, BHP

I S Systems can help your business

Get in touch with us to find our how our engineering, manufacturing and product expertise can improve your processes.

More Case Studies

Industrial

MM Kembla – Seamless S5 to S7 PLC Migration

MM Kembla required a modernisation strategy to upgrade ageing Siemens S5 PLC systems that were nearing end-of-life. To ensure reliability, reduce maintenance risk, and protect ...
Read More →
Mining

Rowell Highway Power Station

When the need arose to replace 18 obsolete Modicon PLCs with modern Siemens S7-1500 PLCs, I S Systems was tasked with delivering a seamless, compliant, ...
Read More →
Industrial

Sunshine Sugar Harwood Mill

Modernising Reliability with a Complete Sugar Bagger PLC Upgrade
Read More →
Generator Control Panels, Instrumentation & alternator
Energy

Ship Generator Control Upgrade

A narrow delivery timeline for a dry-dock maintenance window presented an opportunity for I S Systems to provide a speedy, low downtime solution.
Read More →
Copper Tube Finished product
Industrial

Copper Tube Line PLC & Drive Upgrade

In this project, I S Systems delivered replacements of the PLC, DC Drives, Saw Motor/Gearbox & AC drive, and an upgrade of analogue control modules for a ...
Read More →
Mining

Improving Bucket Wheel Reclaimer Reliability

I S Systems partnership with iba-Oceania delivered an logging and analysis package that greatly improved reliability of a Port Headland bucket wheel reclaimer.
Read More →
Conveyors at the center of the award winning s5 to s7 PLC upgrade

Award Winning PLC Upgrade

I S Systems implementation of the S5-to-S7 upgrade garnered industry recognition and solidified our presence as a leading expert in PLC upgrade strategies.

Read More
Full panel for motor test rig

Flexible Motor Test Rig

I S Systems solution to the specific and complex testing requirements of our customer was innovative, flexible and fast - which resulted in a transportable testing rig...

Read More

Rowell Highway Power Station

When the need arose to replace 18 obsolete Modicon PLCs with modern Siemens S7-1500 PLCs, I S Systems was tasked with delivering a seamless, compliant,...

Read More