The Challenge

At the South32 GEMCO Rowell Highway Power Station, reliability is non-negotiable. The facility supplies power to the local community, which means even the slightest downtime can have significant consequences. When the need arose to replace 18 obsolete Modicon PLCs with modern Siemens S7-1500 PLCs, I S Systems was tasked with delivering a seamless, compliant, and low-risk upgrade—without interrupting ongoing operations.

Upgrading critical control systems in a live power plant requires precision, deep expertise, and a strategy that prioritises continuity. The solution needed to meet modern standards while ensuring full transparency of system behaviour throughout the transition.

The Approach

To achieve a smooth changeover, I S Systems implemented a staged upgrade methodology supported by ibaPDA and ibaHD-Server. These tools enabled engineers to:

  • Install the new PLCs alongside the existing Modicon units.
  • Capture and monitor both systems in real time
  • Compare behaviours, identify discrepancies, and fine-tune before cutover

This non-intrusive monitoring ensured each step was validated, allowing for absolute confidence at every stage of the upgrade.

Key Outcomes

The project delivered a modernised control system while keeping the power station fully operational. Benefits included:
● Minimal downtime across the entire upgrade process
● One-at-a-time generator transitions, with safe decommissioning and recommissioning
● Master controller upgrades performed under manual control for added safety
● Smooth return to automatic mode, with no issues post-handover
Because iba is a non-invasive diagnostic solution, the upgrade required no additional wiring or major system disruption. Even after project completion, the iba system was left in place to continue providing valuable operational insights — and four years later, it remains actively used.

Long-Term Impact

This project demonstrates how combining engineering expertise with advanced monitoring technology can significantly reduce risk during complex modernisation work. For critical infrastructure like power generation, this approach ensures reliability, transparency, and confidence during major transitions.

Conclusion

The successful upgrade at South32 GEMCO highlights the value of thoughtful planning, staged execution, and intelligent diagnostic tools. By integrating modern PLC technology with real-time monitoring, I S Systems delivered a future-ready solution that strengthened reliability without disrupting critical operations. This case stands as a model for how essential infrastructure can be modernised safely, efficiently, and with long-term value in mind.

I S Systems can help your business

Get in touch with us to find our how our engineering, manufacturing and product expertise can improve your processes.

More Case Studies

Mining

Rowell Highway Power Station

When the need arose to replace 18 obsolete Modicon PLCs with modern Siemens S7-1500 PLCs, I S Systems was tasked with delivering a seamless, compliant, ...
Read More →
Industrial

Sunshine Sugar Harwood Mill

Modernising Reliability with a Complete Sugar Bagger PLC Upgrade
Read More →
Generator Control Panels, Instrumentation & alternator
Energy

Ship Generator Control Upgrade

A narrow delivery timeline for a dry-dock maintenance window presented an opportunity for I S Systems to provide a speedy, low downtime solution.
Read More →
Copper Tube Finished product
Industrial

Copper Tube Line PLC & Drive Upgrade

In this project, I S Systems delivered replacements of the PLC, DC Drives, Saw Motor/Gearbox & AC drive, and an upgrade of analogue control modules for a ...
Read More →
Bucket Wheel Reclaimer
Mining

Improving Bucket Wheel Reclaimer Reliability

I S Systems partnership with iba-Oceania delivered an logging and analysis package that greatly improved reliability of a Port Headland bucket wheel reclaimer.
Read More →
Conveyors at the center of the award winning s5 to s7 PLC upgrade
Mining

Award Winning PLC Upgrade

I S Systems implementation of the S5-to-S7 upgrade garnered industry recognition and solidified our presence as a leading expert in PLC upgrade strategies.
Read More →