Siemens S5 PLC service, support and upgrade
 
siemens-s5 ag    Siemens has produced the S5 range of automation products since the early 1980’s. These products have come to the end of their life and are no longer supported by Siemens.

How does this affect your plant?

• Cost of spares are becoming more expensive, availability is decreasing and lead time to receive spares is increasing

• Specific Product knowledge of S5 PLC products and specialist knowledge is not readily available
 


S5 Phase out Timeline

s5-phaseout2













Our S5 Know-How is your advantage
 
I S Systems have the expertise to offer continued support for the S5 PLC systems, with extensive range of stocked spares and specialist service engineers, available around the clock.

We can also conduct independent audits to establish your level of exposure and offer solutions to keep your plant producing.

I S Systems have devised a number of proven upgrade strategies to cope with the S5 phase-out with over 100 major conversions successfully completed over the last 5 years.

Experienced Engineers with a combined experience of over 75 years of S5 knowledge can assess your risk and tailor solutions to fulfill your change-out requirement and budget.


S5 Service & Support

We carry out site audits to determine:

• A rationalised list of S5 parts in use on site
• Evaluation of S5 spares held on site and advise on critical spares
• S5 program backup verifications
• Support and upgrade proposals


S5 upgrades

Upgrades can take any number of pathways and include:

• Full upgrades: The S5 CPU and I/O is replaced in its entirety with state of the art S7 gear

• Partial upgrades:
   o Upgrade the S5 CPU to S7, but maintain the existing S5 I/O’s
   o Upgrade the S5 I/O’s to S7, but maintain the existing S5 CPU

Each Strategy offers distinct advantages, let us advise you on which one suits you best.

S5 change outs need not result in plant downtime. I S Systems recently completed an upgrade of an S5 system with 8 networked PLC’s and a total of 3500 I/O points during a normal 72 hour planned plant maintenance shut. This project won the national PACE Zenith awards 2007.

Give us a call and let us objectively assess your risk and formulate a service & support or upgrade strategy that fits your needs.